CREDENTIALS

CONTACT US
DREES & SOMMER ZURICH SANDERS NETWORKS PERFORMANCE INDEX 15.02.2019
DRESS&SOMMER ZURICH

PERFORMANCE INDEX

Sanders Networks completed work on the Main Building Zurich 2018-2019

 

  1. 200 S/FTP Permalinks Cable pull for wlan, dect, net.
  2. Mounting the RJ45, cans for wlan, dect, net
  3. Installation of the wifi boxes in the hole Building
  4. Connection of the 400 RJ45 CAT 6A connection sockets.
  5. Measurements of the 200 RJ45 CAT 6A connector sockets with Fluke.
  6. 2 * rack installations and rack construction (panel marshalling-earthing-230Volt etc.)
  7. Inscription of the IT installation and legends Creation of the IT installation.
SCHOOL FOR FASHION & CREATIVITY ZURICH SANDERS NETWORKS PERFORMANCE INDEX 15.08.2018

SCHOOL FOR FASHION & CREATIVITY ZURICH

PERFORMANCE INDEX

Sanders Networks completed work on the new School for fashion and creativity Zurich 2018

  1. Connection of the 500 RJ45 CAT 6A multimedia connection module
  2. Measurements of all 250 RJ45 CAT 6A connection modules with Fluke meter.
  3. Installation from wlan boxes in the hole House
  4. Mounting the RJ45, cans for wlan, dect, net
  5. Inscription of the IT installation and legends Creation of the IT installation.
GREENCITY ZURICH SANDERS NETWORKS PERFORMANCE INDEX 30.06.2018
GREENCITY ZURICH

PERFORMANCE INDEX

Sanders Networks completed work on the Green City Zurich 2018

 

  1. Connection of the 600 RJ45 multimedia connection modules
  2. Connecting the 80 RJ45 connector plug for I.O.T for touch panel in the apartment.
  3. Measurements of all 680 RJ45 CAT 6 connection modules with Fluke meter.
  4. Construction of multimedia distributors in all 40 apartments
  5. Assembly of all RJ45 connection boxes
  6. Rack construction and integration of permalinks
  7. 160 blind plug connected for the awnings and window blinds.
  8. Labeling of the IT installation.
NVIDIA ZURICH EUROPAALLEE SANDERS NETWORKS PERFORMANCE INDEX 15.04.2018

NVIDIA ZURICH

PERFORMANCE INDEX

Sanders Networks completed work on the new NVIDIA OFFICE at Europaallee Zurich 2018

  1. All racks rebuilt from basic to tenant development.
  2. 500 permalinks expanded from the existing rack and completely rebuilt and integrated into the new rack.
  3. 10 Fiber-optic KEVs with 240 connections removed from the old rack and rebuilt and integrated into the new rack.
  4. Integrate fiber optic cable entry from BD to FD and connect the 24 fibers to the KEVs.
  5. Connections of the RJ45-CAT 6 sockets, for cameras, Dect and workplaces (PC - printers etc.)
  6. Measurements of 200 RJ45 CAT 6 connector sockets with Fluke.
  7. Inscription of the IT installation and legends Creation of the IT installation.
KONGSBERG AUTOMOTIVE ZURICH EUROPAALLEE SANDERS NETWORKS PERFORMANCE INDEX 15.03.2018
KONGSBERG ZURICH

PERFORMANCE INDEX

Sanders Networks completed work on the new KONGSBERG AUTOMOTIVE OFFICE at Europaallee Zurich 2018

 

  1. Complete floor boxes Installation in the office.
  2. From the basic construction on tenant removal Floor boxes Converted 80 floor boxes with 2xUKV each RJ45 + 3 * type23.
  3. Measurements of all RJ45 CAT 6 connector sockets with Fluke.
  4. Inscription of the electrical + IT installation and legends Creation of the electrical + IT installation.
NIEDERHASLI MULTI-PURPOSE HALL SANDERS NETWORKS PERFORMANCE INDEX 05.02.2018

MULTI-PURPOSE HALL

PERFORMANCE INDEX

Sanders Networks completed work on the new Multi-porpose hall - Niederhasli

 

  1. Cable pull, installation and connection of the swirl diffusers of the ventilation flaps.
  2. 60 permalinks cable pull for Wi-Fi
  3. Connecting 200 RJ45 CAT 6A sockets
  4. Rack installation and setup (Panel moun- ting brackets-Grounding-230Volt etc.)
  5. UCC can mounting Edizio 2xRJ45.
  6. Cable pull of the S-bus and connection of the S-Bus - ventilation etc... .
  7. Measurements of the WLAN RJ45 CAT 6A connector sockets with Fluke.
  8. Inscription of the IT installation and legends Creation of the IT installation.
  9. Entire Stage Technology cable entry, 5 * 2.5 - 3 * 2.5, U72, Cable Cat 7, fiberglass fiber optic, Dataflex, from the stage stadiums to the stage technique rack.
  10. Connections of UV-B, UV-EC, UV-RWA, UV-OG.
SEM MIGRATION OFFICE ZURICH SANDERS NETWORKS PERFORMANCE INDEX 03.09.2017
SEM-ZH MIGRATION OFFICE

PERFORMANCE INDEX

Sanders Networks completed work on the SEM Migration Office Zurich 2017

 

  1. 200 S / FTP - CAT7 Permalinks Cable pull.
  2. Connections of the 400 RJ45 CAT 6A connector sockets (rack and workstations).
  3. Rack installation and rack construction (panel marshalling-earthing-230Volt etc.)
  4. Measurements of the 200 RJ45 CAT 6A connector sockets with Fluke.
  5. Fiber optic LWL from BD-FD, all Kevs in the racks installed in the technical room and server room, on both sides 72 fiber optic connections connected.
  6. Inscription of the IT installation and legends Creation of the IT installation.
SWISS ZURICH AIRPORT - SHIPYARD 3 SANDERS NETWORKS PERFORMANCE INDEX 05.05.2017

SHIPYARD 3

PERFORMANCE INDEX

Sanders Networks completed work on the Shipyard 3 Swiss Zurich Airport 2017

 

  1. 500 U / UTP Permalinks Cable pull.
  2. Connection of the 1000 RJ45 CAT 6 connection sockets.
  3. Measurements of the 500 RJ45 CAT 6 connector sockets with Fluke.
  4. 3 * rack installations and rack construction (panel marshalling-earthing-230Volt etc.)
  5. Inscription of the IT installation and legends Creation of the IT installation.
  6. (Zuko Access Control) All doors recessed U72, entry-reader (badge) assembly.
  7. All cables hooked up on Zuko boxes, AMC Mounted and connected with S / FTP CAT 7 to the rack and Zuko boxes.
  8. 1 * rack conversion old rack in operation built into the new rack
  9. Voice Panel installed in the racks as well as connected.
  10. 3 Kevs built in the racks and connected and installed in the server room 3 Kevs and connected.
MIGROS CLUBSCHOOL ZURICH SANDERS NETWORKS PERFORMANCE INDEX 10.09.2016
MIGROS CLUB SCHOOL

PERFORMANCE INDEX

Sanders Networks completed work on the Migros Club School Limmatplatz Zurich

 

  1. 100 UKV CAT7 S / FTP permalinks cable pull.
  2. Connection of 500 RJ45 CAT 6A connector sockets.
  3. Measurements of the RJ45 CAT 6A connector sockets with Fluke.
  4. Inscription of the electrical + IT installation and legend of the Elektro + IT installation.
  5. 3 old UV suspended and cables sounded out for the new UV. New 3 UV switched back on.
MANOR SANDERS NETWORKS PERFORMANCE INDEX 05.05.2016

MANOR

PERFORMANCE INDEX

Sanders Networks completed work on the new Manor

 

  1. 200 UKV CAT7 S / FTP Permalinks Cable pull.
  2. Connecting the 400 RJ45 connector sockets CAT 6.
  3. Rack construction for 200 RJ45 CAT 6 connection sockets (panel moun- ding brackets-earthing-230Volt etc).
  4. Measurements of the WLAN RJ45 CAT 6 connector sockets with Fluke.
  5. Inscription of the IT installation and legends Creation of the IT installation.
  6. UPS installation for the network.
UBS BANK PARADEPLATZ ZURICH SANDERS NETWORKS PERFORMANCE INDEX 03.06.2015
UBS BANK PARADEPLATZ

PERFORMANCE INDEX

Sanders Networks completed work on the UBS Bank at Paradeplatz HGHG

 

  1. UCC-High-Low-Current Installations Goldoffice UG1-EG.
  2. 150 S / FTP CAT7 permalinks cables pull
  3. Connection of the 300 RJ45 CAT 6 connection sockets.
  4. Rack Installation and installation of the rack (panel moun- ting brackets-earthing-230Volt etc ).
  5. Measurements of the RJ45 150 connector sockets with Fluke.
  6. Inscription of the IT installation and legends Creation of the IT installation.
  7. Complete cable pull of the alarm system.
  8. Cable pull, installation & connecting of video surveillance.
  9. Cable pull, installation & connecting of emergency light exit.
  10. Cable pull, installation & connecting for fire alarm system in UG1.
  11. High Voltag Cable pull 3*2.5 - 3*1.5 UG1.
  12. Cable pull, installation& connecting of motion detectors.
HOTEL GRAND KAMEHA ZURICH SANDERS NETWORKS PERFORMANCE INDEX 15.01.2015

GRAND KAMEHA

PERFORMANCE INDEX

Sanders Networks completed work on the new Hotel Grand Kameha Zuerich

 

  1. 100 CAT 7 S / FTP permalinks cable pull.
  2. Connecting the 200 RJ45 CAT 6A connector sockets.
  3. Rack installation and construction of the rack (panel marshalling-earthing-230Volt etc.)
  4. Measurements of the 200 RJ45 CAT 6A connector sockets with Fluke.
  5. Cable pull of fire engine cable throughout the hotel all floors.
  6. Inscription of the IT installation and legends Creation of the IT installation.
  7. Connections of the 7 FD in the MF for kitchen and Bar-Restaurant.
UBS BANK BELLEVUE ZURICH SANDERS NETWORKS PERFORMANCE INDEX 08.08.2014
UBS BANK BELLEVUE

PERFORMANCE INDEX

Sanders Networks completed work on the UBS Bank am Bellevue in Zurich

 

  1. 400 S / FTP CAT7 permalinks cables pull.
  2. Connection of the 800 RJ45 CAT 6 connection sockets.
  3. Installing the ground cans for the network.
  4. Structure of the rack (panel moun- ding brackets ground 230Volt etc.).
  5. Measurements of the 400 RJ45 CAT 6 connector sockets with Fluke.
  6. Cable pull of the S-Bus and connection of the S-Bus.
  7. Cable pull for voice panel, installation of panel and Vs 83 modules & connection of RJ45 & VS 83 modules..
  8. Inscription of the IT installation and legends Creation of the IT installation.
ZHdK-ZURICH HIGH SCHOOL OF ART-SANDERS NETWORKS PERFORMANCE INDEX 28.07.2012 - 30.04.2014

ZHdK-Zurich

PERFORMANCE INDEX

Sanders Networks completed work on the new ZHdK- Zurich High School of art - Zurich

  1. Complete video surveillance installation: 90 CAT 7 S / FTP permalinks, 180 RJ45 CAT 6A connections, 90 V RJ45 CAT 6A connectors with Psiber, complete video surveillance system labeling, installation for the cameras and 90 video surveillance cameras.
  2. 3 server rooms & 53 technical rooms: Construction of the IT infrastructure in the 3 server rooms & 53 technical rooms, partial connections of the RJ45 CAT 6A connections Measurement of the UKV RJ45 CAT 6A connections with Psiber.
  3. Fiber-optic cabling of the 60 racks in the main server room, labeling of the entire IT in the server rooms.
  4. 53 * 20x4 - Tel-VS 83 & Voice over IP connections throughout the whole building.
  5. IT person responsible for the overall structure of the IT installation in the ZHdK
  6. Complete UCC cabling S / FTP CAT 7 and installation in the reception office of the ZHdK.
  7. Construction of the rack in the Chamber Music Hall 1 and recording studio big room.
  8. S-Bus installation complete set-up of the service bus with UCC CAT 7 S / FTP permalinks, connections of the RJ45 CAT 6A connections, measurements of the UCC RJ45 CAT 6A connections with Psiber, complete IT labeling.
  9. Instacom IP TV installation: installation of the switches and verification of the installation.
  10. BM Installations: Fire Detector Cable pull and Fire Detector Installations & connecting.
  11. Evak: connections of the Evacuation system and labeling.
SHILCITY - ZURICH SANDERS NETWORKS PERFORMANCE INDEX 10.09.2012
SHILCITY ZURICH

PERFORMANCE INDEX

Sanders Networks completed work on the Shilcity Zurich

 

  1. 130 UKV CAT 7 S / FTP Permalinks Cable pull for Wi-Fi and KFM + surveillance cameras.
  2. Connection of the 260 UKV CAT 6A connector sockets.
  3. Installation of the 80 KFM + surveillance cameras throughout and outside the Sihlcity.
  4. Assembly of the 65 network doses AP 2xRJ45.
  5. Measurements of the 130 RJ45 CAT 6A connector sockets with Fluke.
  6. Inscription of the IT installation and legends Creation of the IT installation.
  7. LWL fiber optic cable BD-FD, all Kevs in the racks installed in the (rack room) and server room, on both sides 48 fiber optic connections connected.
SWISSCOM SANDERS NETWORKS PERFORMANCE INDEX 05.05.2012

SWISSCOM

PERFORMANCE INDEX

Sanders Networks completed work on the Swisscom - Muellerstrasse

 

  1. 200 UKV CAT 7 S / FTP cable pull.
  2. Connections of the 400 RJ45 CAT 6A.
  3. Measurements of the 200 RJ45 CAT 6A connector sockets with Fluke.
  4. Rack installation and assembly (panel marshalling grounding 230Volt etc.).
  5. Inscription of the IT installation and legends Creation of the IT installation.
  6. Access control cable pull and connection.
CSS INSURANCE SCHLIEREN SANDERS NETWORKS PERFORMANCE INDEX 15.03.2012
CSS INSURANCES

PERFORMANCE INDEX

Sanders Networks completed work on the CSS insurances Schlieren.

 

  1. Dismantling of the old UCC + 230Volt installation
  2. 100 UCC CAT 7 S / FTP cable pull.
  3. Rack installation and setup (Panel Moun- ting brackets-Grounding-230Volt etc.)
  4. Connection of 200 RJ45 connection sockets
  5. Measurements of the RJ45 connector sockets with Fluke.
  6. Inscription of the electrical + IT installation and legends Creation of the electrical + IT installation.
  7. High Voltage Cable pull
ZURICH UPPER COURT SANDERS NETWORKS PERFORMANCE INDEX 05.02.2010-31.01.2012

ZURICH UPPER COURT

PERFORMANCE INDEX

Sanders Networks completed work on the new Zurich Upper Court

 

  1. Complete activation of Warema Sunshade in the new building of the Zurich High Court.
  2. Complete construction of the heavy current EC - 1st floor - 2nd floor - 3rd floor - 4th floor - 5th floor - New building section.
  3. Complete construction of the weak current EC - 1st floor - 2nd floor - 3rd floor - 4th floor - 5th floor - New building section.
  4. Installation of candlesticks and LED lamps - New building section.
  5. Inscriptions of the electrical installation in the new building section.
Contact Us